Skip to main content
Cost of poor quality

COPQ reduction consulting for automotive suppliers

Scrap is only the visible part. We help you find the full cost of poor quality in your plant, rank it, and take it down with corrective actions that hold.

Based in Decatur, Alabama, serving AL, TN, GA, MS, KY and SC

What cost of poor quality really includes

Cost of poor quality (COPQ) is everything you spend because work was not right the first time. Most plants track scrap. Far fewer add up the rest.

  • Internal failure: scrap, rework, sorting, re-inspection, unplanned downtime tied to quality problems, and extra material handling.
  • External failure: customer complaints, returns, containment at the customer, premium freight, chargebacks and warranty.
  • Appraisal and prevention: the inspection, testing, audits and training you do to catch and prevent problems. These are worth spending on, but they should be spent where the risk is.

The total is usually much bigger than the scrap line on the monthly report. A number you have made peace with is a number nobody is chasing, which is why we start by making the cost visible.

How we reduce it with your team

  1. Baseline. We review your scrap, rework, sort and complaint data and, where it is missing, set up a simple way to capture it. Together we put a number on the loss and agree on how it will be tracked.
  2. Prioritize. We rank the loss by product, process and cause so you attack the few contributors that drive most of the cost.
  3. Find the cause. We work through the biggest problems on the floor with the operators and process owners who live with them, using structured root cause investigation rather than assumptions.
  4. Fix and update. Corrective actions are tied to the identified cause, work instructions are updated, and requirements are clarified so good parts stop being scrapped by mistake.
  5. Verify it held. We check effectiveness and build follow-up into daily work, so improvement does not fade after the engagement ends.

Where hidden cost usually sits

  • Good parts scrapped because the requirement was unclear, so operators err toward the bin.
  • Sorting and extra inspection that began as temporary containment and never ended.
  • The same defect returning because the corrective action addressed the symptom.
  • Premium freight and overtime used to recover from quality escapes.
  • Skilled people pulled from production to chase problems and paperwork.

What this looks like in a real plant

At EFI in Elkmont, Alabama, high scrap was eating into margin. We clarified quality requirements so good parts were not scrapped, accounted for and analyzed every scrap piece, drove robust corrective actions, updated work instructions and raised awareness on the floor. Scrap went from 7% to 0.1%.

At Tenneco in Athens, Alabama, high customer complaints in the oil seal and cylinder head gasket value streams were costing time and credibility. Robust problem solving, cross-departmental leadership activities for buy-in, and a focus on CAPA effectiveness took complaints from 25+ per month to under 5.

See both in the case studies, or read Scrap isn't a cost of doing business and why corrective actions keep reopening.

A simple way to start: your own COPQ list

Before you call anyone, you can start a rough COPQ list yourself. For the last month, write down what you spent on scrap, rework hours, sorting and re-inspection, customer complaints and containment, and premium freight. Do not worry about precision. Use the best numbers you have and mark estimates as estimates. Even a rough total tends to change which problems get attention first.

If that sounds useful but time-consuming, that is where we come in.

Connecting cost, audits and the system

COPQ work and audit work reinforce each other. Audits find where controls are weak, and cost data shows which weaknesses matter most. We often combine them: internal audits to find where the system leaks, and COPQ reduction to fix the expensive leaks first. For ongoing visibility into documents and training, see Stratum MES.

FAQ

Questions we hear a lot

What is a good COPQ target?

It depends on your products, processes and customers. We start with your own baseline and agree on targets that are meaningful for your plant, rather than quoting an industry average.

Do we need a lot of data to begin?

No. Rough, honest numbers are enough to start. Where the data does not exist, we help you set up a simple way to capture it.

Can you help if our main problem is customer complaints?

Yes. Complaint reduction is one of the most common reasons plants call us. At Tenneco, complaints went from 25+ per month to under 5.

How long does it take to see results?

It depends on the problem. We will tell you what is realistic after a plant walk, and agree on how progress will be measured before work starts.

Start with the problem in front of you

What keeps coming up in your morning meeting?

Tell us what is happening, what it is costing your team, and what needs to change. We’ll talk through a practical next step.

Talk through your COPQ